Business under Operation   
Business under Construction   

Company Operating Data   

Power Plants Operating Data   
Cost Management   
Business under Operation
 
Zhangjiakou Power Plant


Zhangjiakou Power Plant is located in Zhangjiakou City, Hebei Province. The plant started construction in 1988 and currently owns 8 generating units with installed capacity of 300MW each. Thus, the total installed capacity of Zhangjiakou Power Plant reaches 2400 MW which makes it the largest coal-fired power plant in North China. Unit 1 to Unit 4 of Phase I were completed and put into operation in September 1995. Construction of Phase II was commenced in July, 1997 and Unit 5, Unit 6 and Unit 7 were put into operation in 1999 and 2000, respectively . Unit 8, the last unit of Zhangjiakou Power Plant was put into commercial operation in Septermber 2001.

Zhangjiakou Power Plant is the backbone coal fired power plant in the Beijing-Tianjin-Tangshan Power Grid. Power generated by Zhangjiakou Power Plant is supplied to the Beijing-Tianjin-Tangshan Power Grid. via three 500kV and three 220kV transmission lines.

Datang Power owns 100% interests of Zhangjiakou Power Plant.

 

 

 
Douhe Power Plant
Gaojing Thermal Po...
Zhangjiakou Power ...
Xiahuayuan Power P...
Panshan Power Comp...
Huaze Hydropower C...
Yungang Thermal Po...
Tuoketuo Power Com...
Tangshan Thermal P...
Shentou Power Comp...
Liancheng Power Co...
Wangtan Power Comp...
Nalan Hydropower C...
Chaozhou Power Com...
Honghe Power Compa...
Ningde Power Compa...
Wushashan Power Pr...
Lixianjiang Hydrop...
 
Copyright © 2000-2005 Datang Power