2006 |
2005 |
2004 |
2003 |
2002 |
| Installed capacity(MW) |
| 1,550 | 1550 | 1550 | 1550 |
| Gross generation(MWh) |
10,546,000 | 10,369,045 | 10418230 | 10021239 | 9206075 |
| On-grid generation(MWh) |
| 9,675,990 | 9720821 | 9345326 | 8569001 |
| Available hours |
| | 8174 | 8218 | 8338 |
| Operation hours |
| | 7978 | 7872 | 7354 |
| Utilization hours |
| 6,690 | 6721 | 6465 | 5939 |
| Capacity factor(%) |
| | 76.73 | 73.80 | 67.80 |
| Load factor(%) |
| | 84.25 | 82.13 | 80.76 |
| Equivalent availability factor(%) |
| 95.35 | 93.05 | 93.79 | 95.17 |
| Coal consumption per unit of electricity delivered (kg standard coal / MWh) |
| 362 | 362 | 362 | 362 |
|